All Solutions

Solutions

Colocation & Data Center Space

Retail, wholesale, powered shell, and AI-ready facilities

The colocation market in 2026 is not what it was five years ago. AI workloads have changed everything: power density requirements have tripled, liquid cooling has gone from exotic to essential, and the difference between a facility that can handle your AI infrastructure and one that can't is the difference between 8 kW per rack and 40 kW per rack.

Finding a colocation facility used to be straightforward: pick a location near your users, find a provider with the right certifications, negotiate a rate per kW, and sign a contract. Today, the decision matrix is dramatically more complex. If you're deploying GPU clusters for AI training, you need liquid cooling capability and most facilities built before 2022 don't have it. If your workloads require direct cloud on-ramps to AWS, Azure, or Google Cloud, you need a facility with those interconnections already in place, not one that promises to "bring them in."

Power density is the single most important specification for AI workloads, and it's the one most operators overstate. A facility that advertises "high density" at 15 kW per rack is fine for traditional compute. It won't run a rack of H100s. You need 30-50 kW per rack with liquid cooling infrastructure that's actually installed, not "available upon request" which usually means they'll build it in 18 months if you sign a big enough contract.

Our data center directory cuts through the marketing language. We catalog the specifications that matter for modern workloads: actual available power density, cooling methodology (air, liquid, immersion, hybrid), GPU/AI readiness, on-site carrier and cloud connectivity, compliance certifications, and sustainability metrics. You search by what you need, not by what the provider wants to sell you.

How We Help You Find the Right Facility

Our directory lets you search and compare data centers by the specifications that actually matter: location, available power density (not nameplate, actual), cooling type, AI readiness, cloud on-ramps present on-site, and compliance certifications. We verify what providers claim.

For high-value deployments, we can perform a connectivity assessment on your shortlisted facilities, evaluating fiber diversity, carrier presence, network path quality, and interconnection options to make sure the facility's network matches its power and cooling.

We connect you directly with facility operators and manage the introduction so you're talking to the right person, not a generic sales queue. Our relationships with operators like Equinix, Digital Realty, CoreSite, and emerging AI-focused providers mean you get access, not a callback in two weeks.

Who This Is For

  • Companies deploying AI workloads that need liquid-cooled, high-density colocation, not retrofitted traditional facilities
  • Enterprises migrating from on-premises data centers who need to find facilities with the right compliance posture
  • Startups that need a half-cabinet today and a full cage in 12 months, with a provider that can scale without forcing a migration
  • Organizations with geographic diversity requirements who need to evaluate facilities across multiple markets simultaneously

Ready to find the right fit?

Tell us what you need. We match you with providers who actually deliver.